Home› Robot Safety
Discussion
Back to discussions page
pgb123
Posts: 12 Apprentice
MIR-100 with UR10 on top, Tipping Point? |
81 views
|
Not answered yet | |
/ Started by Unknown
in Robot Safety
|
0 comments |

in Robot Safety
Hi, seems a lot of you have mounted UR's on top of MIR's.
We are currently quoting for a large number of (dual battery) MIR-100's with UR-10's on top
I believe if the UR10 is fully extended laterally then it can only lift 5KG's is that right?
And if the UR10 was mounted in the middle of the MIR-100 and was carrying 5KG's, how far sideways could it extend before it would tip over the MIR?
Is there a technical term for this other than "tipping point" ?
We are currently quoting for a large number of (dual battery) MIR-100's with UR-10's on top
I believe if the UR10 is fully extended laterally then it can only lift 5KG's is that right?
And if the UR10 was mounted in the middle of the MIR-100 and was carrying 5KG's, how far sideways could it extend before it would tip over the MIR?
Is there a technical term for this other than "tipping point" ?