Hi, seems a lot of you have mounted UR's on top of MIR's.We are currently quoting for a large number of (dual battery) MIR-100's with UR-10's on topI believe if the UR10 is fully extended laterally then it can only lift 5KG's is that right?And if the UR10 was mounted in the middle of the MIR-100 and was carrying 5KG's, how far sideways could it extend before it would tip over the MIR?Is there a technical term for this other than "tipping point" ?
Hi, seems a lot of you have mounted UR's on top of MIR's.
We are currently quoting for a large number of (dual battery) MIR-100's with UR-10's on top
I believe if the UR10 is fully extended laterally then it can only lift 5KG's is that right?
And if the UR10 was mounted in the middle of the MIR-100 and was carrying 5KG's, how far sideways could it extend before it would tip over the MIR?
Is there a technical term for this other than "tipping point" ?